Transaction Details
Tx Hash:
F5g9mUzqirjtgcksZP3Tw7
Status:
OnChain
Block:
Bundler:
0xF5d3B0bF5C6F4bEC970679Ee78caDbeA8bb72417
Timestamp:
Nov.21.2023 10:08:03 AM
Caller:
0x23b7ac76707503a79accdc8e045b4cb9cf277a87
Signature:
0xc5a13262c2547ddec8a3b2815aa56b5b53ebd4bc9987655a8d5dbb8d8a80f9dd66ccd88d62703416e3d611dbcc81981486b1a0b0890729eab1e3f633dc2ddb101c
SepId:
1
Namespace:
RajCampign
Dataset:
Collection:
Action:
insertOne
Document:
{
  "HSE": "1.\tProject Details\nName of the Project \nName of the Client/ Developer \nName of the Consultant \nName of the Principal Contractor\n2.\tProject Brief Description and Project Layout\n3.\tHSE Management Requirements:  \n1.\tLeadership & Commitment: \n2.\tHSE Policy\n3.\tOrganization, Roles & Responsibilities: \n Project & HSE organizational chart. \n HSE personnel roles & responsibilities. \n Management of subcontractors and suppliers. \n Project key personnel & their contacts\n4.\tCommunication:\nRegular and periodic meetings. \nHSE alerts and notice boards. \nRewards, incentives, recognition & discipline.\n5.\tTraining\nHSE induction.\nToolbox talks. \nSpecial HSE training and awareness. \n\n6.\tSite Inspection & Monitoring \n7.\tIncidents Reporting & Investigation \n8.\tSite HSE Rules & Instructions \n9.\tPersonal Protective Equipment (PPE)  \n10.\tHSE Document Control & Recording System\n4.\tPlanning: \n1.\tRisk Management:  \nIdentification of hazards, assessing the risks and specifying control measures. \n2.\tLegal and Other Requirements:\n3.\tEmergency Management and Evacuation Plan\n4.\tSite Security Plan and Access Control.\n5.\tPermit To Work (PTW) \n6.\tTraffic Management Plan\n5.\tImplementation & Operations  \n1.\tOccupational Health Arrangements\n•\tNoise \n•\tVibration  \n•\tTemperature / heat stress  \n•\tLighting & Ventilation  \n•\tWelfare facilities  \n•\tHazardous substance  \n•\tDust  \n•\tBiological agents \n•\tPets    \n2.\tSafety Arrangements  \n•\tWorking at heights  \n•\tScaffolds & ladders  \n•\tFormworks & structures \n•\tRoofs  \n•\tLifting equipment, lifting gears & lifting operations \n•\tExcavations & trenches  \n•\tConfined Spaces  \n•\tTunnels & Shafts  \n•\tDemolition  \n•\tPiling  \n•\tElectrical equipment & electrical systems  \n•\tElectrical & gas welding  \n•\tGas cutting  \n•\tHazardous materials  \n•\tFire  \n•\tVehicles & mobile equipment & mechanical system\n•\tMachinery, Mechanical Equipment, & Mechanical System. \n•\tPortable tools (electrical, pneumatic & hand tools) \n•\tSegregation of pedestrians from vehicles & moving equipment   \n•\tManual handling  \n•\tFalling objects  \n•\tSlips, trips, & falls \n•\tHousekeeping  \n•\tAnimals & reptiles  \n•\tViolence  \n\n3.\tEnvironmental Arrangements\n\nWaste Management:  \nInclude appropriate control measures for collection, segregation and disposal for the waste with conformance of Abu Dhabi Waste Management Center procedures.\n•\tHazardous waste \n•\tNon-Hazardous waste \n\nSoil Water-Courses & Groundwater Pollution Protection:  \n•\tContainment areas (bounding) for oil, fuel or chemicals storage tanks \n•\tWashing area for concrete mixing trucks and pumps \n•\tDripping trays for machinery, equipment and trucks \n•\tOil spill combating kits or materials \n\nAir Pollution Protection:  \n•\tDust suppression program \n•\tAir emission (periodic maintenance programs for the engines of vehicles, trucks, equipment, plants, machinery, etc.).\n6.\tAudit & Review:  \nContractor shall define the basis under which internal & external HSE auditing and management reviews will be conducted.\n7.\tAppendices: \n"
}